Fall sick in the afternoon after my return from e China trip. Was still sick on e 3rd day when i go for my attachment. My first day there was basically to get familiarize with the equipments and systems there. Went to ACS to see how they set-up for a sports event on e first day, did e recording of e AGM meeting on e second day and assisted in operating the mixer for a company annual event in e MMHotel on e 3rd day.
4th day (9/4): Stayed in office and look-out for potential clients
5th day (10/4): Assisted in the loading of equipments for a big scale concert
6th day (11/4): Assisted in e setting up of equipments at RP
7th day (12/4): Assisted in making sure that e audio systems are working fine and sound check with the emcees
8th day (13/4): Operated e follow spot light and assisted in the packing up of equipments
9th day (14/4): Assisted in setting, packing and operating the mixer for e YCK primary school performance at Punggol Park
10th day (16/4): Assisted in cleaning and coiling of cables and putting them back in e correct place
11th day (17/4): Assisted in setting up of equipments at NYP and at Calvary Church
12th day (18/4): Assisted in PR-ing at NYP
13th day (19/4): Assisted in PR-ing and packing up of equipments at NYP
14th day (20/4): Operated e mixer for e BL primary school sports day event at Pioneer stadium
15th day (21/4): Assisted in setting up of microphones for e SCO performance at Hougang
E above is a list of wat i've done these first 15days with my attached company, Showmakers. It's not easy but I've learnt quite a bit during all these events and i'm expecting more to come my way so stay tune =D